Port Laredo handled $339.3 billion in trade in 2024 and became the largest port of entry in the United States by value — ahead of every seaport and every airport. In 2025 it did $353.94 billion, up 4.4%. The number itself isn’t the headline. What’s in it is.

What actually crosses here

More than 97% of Port Laredo’s trade is with Mexico, and it is overwhelmingly industrial: automotive and auto parts, machinery, electronics, energy products, steel and metals, and consumer goods moving north; components, resins and equipment moving south to the plants that make them. This is the Monterrey–Laredo–I-35 corridor at work, and the freight is the kind that needs a warehouse, not a container yard.

The biggest single change inside the number in 2025 was computing hardware. Data processing units and servers crossing at Laredo went from about $6 billion in 2023 to roughly $31 billion in 2025, as AI server assembly scaled up in northern Mexico. That’s new, and it’s the kind of product that wants bonded, secure, temperature-controlled space at the border rather than a straight run to a distribution center.

Why the ranking wobbled, and why it doesn’t matter

For calendar 2025, Laredo finished third overall — behind O’Hare and JFK. Two one-off spikes did it: gold imports through JFK nearly doubled, and pharmaceutical imports through O’Hare roughly tripled on weight-loss drug demand. Strip those out and the ranking looks like it always has. By spring 2026, Laredo was back at No. 1 on a monthly basis, and it never stopped being the largest land port in the Western Hemisphere.

The reason it doesn’t matter to a shipper: gold and Ozempic don’t need 250,000 square feet on I-35. Auto parts, steel coil, servers and packaged food do. The trade that ranks Laredo is the trade that uses warehouses.

What the growth means for 2026

Nearshoring is showing up in the numbers, not just the headlines. Four-plus percent growth on a $340 billion base, in a year of tariff uncertainty, is production moving to Mexico and crossing here. Monterrey is three hours away. Every plant that opens there adds northbound freight to this crossing.

The constraint is moving from the bridge to the building. Crossing capacity has kept expanding. What hasn’t kept pace is licensed, rail-served, bonded warehouse space at the border. When volume grows and the paperwork gets more complicated — and it has — the freight that wins is the freight that has somewhere to go the day it crosses.

Duty timing matters more than it did. Tariff rates changed repeatedly in 2025 and the USMCA is now under annual review. When you don’t know what the rate will be next quarter, holding product in a customs bonded warehouse with the duty clock stopped, and withdrawing only what you sell, stops being a paperwork exercise and becomes a hedge.

Rail is back in the conversation. Heavy northbound commodities — steel, paper, industrial equipment — are the cheapest to move by rail and the most expensive to handle twice. A private spur inside the warehouse removes the ramp and the dray. As volume grows, that math gets better.

Where we sit in it

Gilbert International is the first warehouse you see off I-35 coming north from the bridges: 250,000-plus square feet, a 10-car Union Pacific spur, customs bonded Classes 3, 4 and 8, licensed food-grade and TABC-permitted space, and a crew that has worked this crossing since 1939. We don’t move the $354 billion. We hold, transload and dispatch the part of it that needs a building at the border.

Talk to us about the freight, not the statistic

Tell us what you make, how many loads a month cross, and where it goes after Laredo. Fifteen minutes. Request a quote or read why the corridor works.